In 2021, China's first pebble bed high-temperature air-cooling reactor nuclear power demonstration project --- Shandong Shidaowan nuclear power unit was successfully connected to the grid.
Year
In 2021, the world's first 1000MW “double reheat + dual unit heat regenerative" steam turbine was put into operation at Ruijin Power Plant.
Year
In 2021, "Hualong No.1", Pakistan Karachi Unit 2, the first overseas reactor of the third-generation nuclear power unit developed by China, was successfully connected to the grid.
Year
In 2020, the 1240MW single shaft thermal power unit was successfully put into operation at Yangxi Power Plant.
Year
2016, the first Ansaldo E-class ae94.2 gas turbine