Jiangmen Power Plant is the first AE64.3A project in Chinese market. This unit is efficient, environmental sustainable, fast-start capable, and also is operational flexible, reliable, low space consuming. It is used for power, heat and cooling supply in DER projects for industrial parks, residential area, and so on. For similar projects refer to Danyang Project, Ganlu Project, Fengquan Project, etc.
The AE64.3A GT is compact, reliable, easy maintenance and environmental sustainable.
The technical features are as below:
1) High efficiency 15-stage axial compressor, with 1 stage IGV, annular combustion chamber and 24 Dry low NOx hybrid burners for both fuel gas and fuel oil, 4 stage turbine.
2) Robust rotor design with hign stiffness, low weight, easy maintenacce on site.
3) Fast start, fast ramp and hot restart capabilities, and time to reach base load within 25min.
4) NOx emission can be lowered to 15ppm.
5) Fully assembled shipping for gas turbine. Highly integrated auxiliary systems.
- Shanghai Electric Gas Turbine Co Ltd