The project applies the largest domestic RO-MED hybrid system under EPC mode, fully implementing the "waste heat utilization, cost reduction, safety and reliability” design principles. Reliable and cost effective fresh water is provided for the steel plant. The efficient and compact system design allows a leading CAPEX & OPEX.
Hebei Fengnan · Fengyue energy 75000 tons / day ro & 25000 tons / day Med sea water desalination EPC project is the largest thermal membrane coupling EPC project in China, fully implementing the design principle of "waste heat utilization, cost reduction, safety and reliability", providing a stable and reliable, low-cost light water supply for the steel plant, with efficient system operation, compact layout, and leading investment and operation and maintenance costs in the industry Ping.
Shanghai Electric makes full use of the MED technical advantages and high efficient hot water flashing patented design technique. The waste heat of the blast furnace slag water is recovered, exerting the hot water flash technical advantages at a maximum degree and reaching an international advanced level in the indexes of economic and reliability.
- Shanghai Electric Water Engineering Company