Shanghai Electric Power Generation Equipment Co Ltd Turbine Plant-_正规赌钱软件app
Laogang,Shanghai:50MW condensate turbine
The Laogang project is one of the ten key projects in Shanghai during the 13th five-year plan period.The project covers an area of 283 mu, and the construction scale is to incinerate and treat 6,000 tons of household garbage every day, and set up 3 condensate steam turbine generating sets of 50 MW.
    • Rate power:50MW(Max:60MW)

    • Steam inlet :5.2 MPa/440℃

    • Steam extraction :1.8MPa

    • Rate flow:262.5t/h

    • Regeneration system:2(1LP+1DE

    • Back pressure:7.0kPa(a)


After the steam turbine is put into operation, the whole plant of laogang renewable energy utilization center will incinerate and treat the domestic garbage to 3 million tons every year, which accounts for 1/3 of the annual garbage generated by Shanghai residents,and the incineration power generation will reach nearly 1.5 billion KWH per year,it will be presented to the society with the highest standard, advanced technology, high-quality construction and efficient operation, providing more reliable guarantee and high-quality service for urban environmental safety, becoming a new name card of Shanghai and the largest waste incineration plant in the world.



1)Safety and reliability

We are, and will always be making safety and reliability put first. With the experience of the continuously accumulated operation data from more than 2,000 units, we can ensure the safety and reliability of new designed units throughout the lifecycle and the units can continuously run for over five years.

2)High efficiency

The top performance record is continuously refreshed by our start-of-art technology of AIBT full-automatic flow path design system and CFD technology.

3)Easy installation

For maximum easy installation, we can provide integral transportation.

4)Operation flexible

We always focus on making operation more flexible. Through online real-time analysis of the thermal stress, full-automatic control of unit during startup, normal operation, load change and shutdown can be realized.

5)Maintenance convenience

We are dedicated to make maintenance much simpler, only twice overhauls throughout the 30-year service life, increasing at least 4,000 operating hours.


Contact Us
Shanghai Electric Power Generation Equipment Co Ltd Turbine Plant