Mature model configuration and excellent performance support from fossil fired steam turbines.
1 unit set order of HTP200 reactor.
Typical project: Shandong Shidaowan 200MW high temperature gas cooled reactor nuclear power project.
The ultra-high pressure nuclear power turbine for the fourth Generation reactor of SEC is a mature and reliable unit with excellent output developed on the basis of fossil fired ultra supercritical unit. It has obvious advantages in unit output, safety and reliability, operation and maintenance simplicity, and its performance has reached the world-class advanced level.
Unit type: three cylindera and four exhaust, condensing type, integral forging rotor, rated speed 3000rpm, 1146mm last stage blade
Advantages:
High Performance
Advanced and Efficient AIBT blade flow Design Technology.
Flow optimization design of CFD structure.
Flexible Operation
Button start-up; Built-in stress/temperature control, easy operation.
Rise rate/load change rate program automatically calculates, 5 minutes from zero speed to rated speed.
Easy Maintenance
High reliability of the series, Major maintenance interval: 12 years;
HP module integral transport after assembled in the factory; Install as modular.
Integral high-pressure cylinder design, greatly shorten the maintenance cycle.
Combined fuel tank, Highly integrated auxiliary system.
- Shanghai Electric Power Generation Equipment Co Ltd Turbine Plant