Reliable performance, advanced in China
F Class gas-steam combined cycle HRSG: 24 units
Typical projects: Huaneng Shidongkou, Zheneng Xiaoshan, Huadian Nanjiang II, Shenergy Fengxian, Datang Gaoyao
Reliable and stable operation. The main performance parameters reach or is better than the design value. The company has mature experience in cooperating with four main gas turbine manufacturers. The technology is in a leading position in China.
1)Fast start-up and shut-down, and prominent variable load capacity (2)High degree of modularization, easy installation, high reliability (3)Low barycenter, strong shock resistance
(4) Uniform flue gas flow field,low noise
(5)Easy field installation and short construction time.
- Shanghai Boiler Works Co Ltd.