Tianji II 2×660MW Ultra-supercritical Two-pass Boiler
The power plant is located in Tianji Township, about 30km northwest to Huainan City, Anhui Province.
The Project adopts two 660MW Ultra-supercritical Two-pass Boilers. Two boilers have been put into operation respectively on December 22, 2013 and April 28, 2013.
The first self-developed 620℃ PC boiler in China (also the first 620℃ two-pass boiler in the world) in 2013, which initiates high-parameter ultra-supercritical units and marks a milestone in thermal power generation industry development in China.
(1) Two-pass arrangement with better safety, reliability, and lower electricity consumption.
(2) Advanced compound air classification low NOx tangential combustion system, high-efficient, environment friendly, with wider coal adaptability.
(3) Reasonable heating surface arrangement and temperature regulation mode with better regulation of steam temperature.