Shanghai Boiler Works Co Ltd.-_正规赌钱软件app
Guohua Yuedian Taishan I 5×600MW Subcritical Two-pass Boiler
The power plant is located in Tongluowan, Taishan City, Guangdong Province. The Project adopts five 600MW Subcritical Two-pass Boilers. The boilers have been put into operation respectively on December 9, 2003, April 9, 2004, January 21&27 and November 28, 2006.

Lots of boilers below subcritical had been put into operation since 1950s, many of which are China's first, with a leading position in boiler industry in China. 

(1) Two-pass arrangement with forced circulation, mature and reliable. (2) Advanced tangential combustion system, high-efficient, environment friendly, with wider coal adaptability.

(3) Flexible choice of temperature regulation mode with high reliability.

Contact Us
Shanghai Boiler Works Co Ltd.
Address:No.250 Huaning Road, Shanghai, PRC
Post code:200245
Tel: +86(21)6430 2391
Fax:+86(21)6430 1980