After the project is put into operation, it is expected to provide about 40.88 million kWh of green electricity for the factory area every year. Compared with a coal-fired power plant with the same power generation capacity, it is equivalent to saving about 11,758.78 tons of standard coal annually, reducing sulfur dioxide emissions by about 6.5 tons, reducing carbon dioxide emissions by about 33,990 tons, and reducing nitrogen oxide emissions by about 7 tons. The energy conservation and emission reduction benefits are significant.
This project involves seven 10KV high-voltage grid connection points and eight 0.4KV low-voltage grid connection points. The grid connection points are scattered and difficult to regulate. A power quality detection system and a photovoltaic power prediction system are used.
- Shanghai Electric Distributed Energy Technology Co.,Ltd.