Rate power:100MW
Steam inlet :14~16MPa(a)/565 ℃
Rate flow:570t/h(max598.5t/h)
Regeneration system:1DE
Back pressure:0.785MPa(a)
Rotating speed : 3000 r/min
After the completion of the yufeng project, the steam turbine will provide industrial steam for the park. The operation mode is based on heat and electricity, which is another demonstrative cogeneration project after the Nanjing yudai project of our factory.The yufeng project adopts the modular design, matching the new sub-critical parameter grade flow.
1)Safety and reliability
We are, and will always be making safety and reliability put first. With the experience of the continuously accumulated operation data from more than 2,000 units, we can ensure the safety and reliability of new designed units throughout the lifecycle and the units can continuously run for over five years.
2)High efficiency
The top performance record is continuously refreshed by our start-of-art technology of AIBT full-automatic flow path design system and CFD technology.
3)Easy installation
For maximum easy installation, we can provide integral transportation.
4)Operation flexible
We always focus on making operation more flexible. Through online real-time analysis of the thermal stress, full-automatic control of unit during startup, normal operation, load change and shutdown can be realized.
5)Maintenance convenience
We are dedicated to make maintenance much simpler, only twice overhauls throughout the 30-year service life, increasing at least 4,000 operating hours.