Excellent performance, safety and reliability, convenient maintenance
8 units for CPR1000 reactor are ordered and put into operation.
Typical projects: Guangdong Yangjiang nuclear power project, Guangxi Fangchenggang phase I nuclear power project.
8 nuclear power turbines for the second plus generation reactor of SEC have already put into operation. The measured power of the units is higher than the designed value, which highly appreciate by the customers. The performance has reached the world-class level.
Unit type: three cylindera and four exhaust, condensing type and with MSRs, shrunk rotor, rated speed 1500rpm, 1396mm last stage blade.
Advantages:
High Performance
Advanced and Efficient AIBT blade flow Design Technology.
Flow optimization design of CFD structure.
Flexible Operation
Button start-up; Built-in stress/temperature control, easy operation.
Rise rate/load change rate program automatically calculates, 5 minutes from zero speed to rated speed.
Easy Maintenance
High reliability of the series, Major maintenance interval: 12 years;
HP module integral transport after assembled in the factory; Install as modular.
Integral high-pressure cylinder design, greatly shorten the maintenance cycle.
Combined fuel tank, Highly integrated auxiliary system.