
2019Year
In 2019, yx2.0 new generation high-performance universal high-voltage motor successfully developed to reach the international first-class level

2019Year
In 2019, domestic leading and international first-class 40mW vertical synchronous motor was successfully offline

2018Year
Putian Branch officially operates in 2018, which is the first time the company has built a factory in another place

2011Year
In 2011, 20MW / 5040rpm ultra high speed explosion-proof variable frequency speed regulating synchronous motor was successfully developed

2009Year
In 2009, Jiang Zemin wrote an inscription for the company

1993Year
In 1993, Li Peng, Wu Bangguo, Huang Ju and other comrades visited Shanghai electric machinery factory

1988Year
In 1988, Zhu Rongji inspected Shanghai Electric Machinery Factory

1986Year
In 1986, Jiang Zemin inspected Shanghai Electric Machinery Factory

1961Year
On May 1, 1961, Comrade Mao Zedong inspected Shanghai Electric Machinery Factory

1960Year
Song Qingling inspected Shanghai electric machinery factory in 1960

1959Year
On December 16, 1959, Comrade Deng Xiaoping inspected Shanghai Electric Machinery Factory

1958Year
In 1958, Zhu De inspected Shanghai Electric Machinery Factory

1958Year
October 1958 the first 12000kW double water internal cooling turbo generator in the world (operated in Nanshi power plant)

1958Year
In 1958, Liu Shaoqi inspected Shanghai Electric Machinery Factory

1954Year
In September 1954, the first 6000kW Air-cooled Turbogenerator in China (operated in Huainan Power Plant)

1954Year
In 1954, Comrade Chen Yun inspected Shanghai Electric Machinery Factory

1951Year
In 1951, a new inspection workshop was built in Min

1949Year
In 1949, Shanghai electric machinery factory was established at no.710, Tongbei Road, Shanghai